Summary Guide to Lab
Requirements:
|
Virgin Contaminants
|
|
Contaminant
|
NH
|
NY
|
| Gasoline / Jet Fuel |
- TPH-GRO
- Total Lead 1 |
- TPH-GRO 4
- Total Lead 1 |
| #2 Fuel Oil Diesel |
- TPH-DRO 2
- Total Lead 1 |
- TPH-DRO 3,4
- Total Lead 1 |
#4, 6 Fuel Oil
|
-TPH-DRO2
-Total lead1
-Total VOCs9
-Total SVOCs9 |
- TPH-DRO 3,4
- Total Lead 1 |
Mixed Fuels
(fuel oil /gas) |
- TPH-DRO/GRO
- Total Lead 1 |
- TPH-DRO/GRO 4
- Total Lead 1 |
Animal, Vegetable, Tall oil |
- TPH by 8100 or
8015DRO |
- TPH by 8100 or
8015DRO 4 |
| Petroleum Solvents |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Ignitibility/Flash |
- TPH by 8100 or 8015DRO 4
- Total VOC’s 4
- Total SVOC’s 4 |
Waxes and Petrolatum |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s |
- TPH by 8100 or 8015DRO 4
- Total VOC’s 4
- Total SVOC’s 4 |
|
Non-Virgin Contaminants
|
|
Contaminant
|
NH
|
NY
|
| Used Oils, Greases, Lubricants |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total RCRA 8 metals |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total RCRA 8 metals |
| Used Animal, Vegetable, Tall oils |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals |
- TPH by 8100 or 8015DRO |
Petroleum Solvents (used) |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- Ignitibility/Flash |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- Ignitibility/Flash |
|
Coal Tars / PCBS / Urban Fill
|
|
Contaminant
|
NH
|
NY
|
Coal tars, coal, pitch, tar, asphalt emulsion |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- Total Cyanide / %Sulfur
( Non-Reactive |
- TPH by 8100 or
8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- Total Cyanide / %Sulfur
- Total BTU
- Total PCBs |
| Urban Fill |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total PAH's
- Total RCRA 8 metals
- PCBs |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- PCBs |
| Electrical oils |
- TPH-DRO
- Total PCBs |
- TPH-DRO
- Total PCBs, |
Transformer Oils |
- TPH-DRO
- Total PCBs |
- TPH-DRO
- Total PCBs |
| Dredge 6 |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total PAH's
- Total RCRA 8 metals
- PCBs
- Total Cyanide / %Sulfur 5 |
- TPH by 8100 or 8015DRO
- Total VOC’s
- Total SVOC’s
- Total RCRA 8 metals
- Total Cyanide /
%Sulfur5
- Total BTU 5
- Total PCBs |
Notes:
1) Total lead required for urban areas, and
historical gas releases where lead may have been present.
2) (NH Facility): Virgin Fuel Releases less than 50 tons do not
require sampling as long as the generator certifies that there are
no other contaminants present.
3) (NY Facility): Certified residential sites under 150 tons require
in-house TPH testing only.
4) (NY Facility): NYSDEC directed virgin spill cleanups require
in-house TPH when
certified virgin and characterization is waived by a NYSDEC Spill
Representative.
5) Required if coal tar is present.
6) Dredged soil must be sampled prior to mixing or drying. Chain of
Custody must reflect this and be included with all lab results.
7) Any soils containing a listed hazardous waste, may be accepted,
at the discretion of the facility when accompanied with a State
Certified “contained-out” determination.
8) At the discretion of the facility, additional lab may be required
for project acceptance.
9)
One sample required for each 500 tons.
Back to Top
4. Acceptable Lab Methods:
All analysis is required to be conducted by a State
Certified lab using SW-846 Methods*.
|
Analysis
|
Method
|
|
TPH
|
GC/FID
|
|
Total VOC's
|
Method 8260
|
|
Total SVOC's / PAH
|
Method 8270
|
|
RCRA 8 Metals
|
Method 6010B
( Arsenic, Barium, Cadmium,
Chromium Total, Lead,
Selenium, Silver and Mercury (7471A) )
|
|
PCBs
|
Method 8082
|
|
Ignitibility
|
Method 1010
|
|
Total Cyanide
|
Method 9010
|
|
Total Sulfur
|
EPA D129-64
|
|
BTU
|
ASTM-D240-87
|
Back to Top
5. Sampling Frequency:
|
Sample
|
ESMI of NH
|
Sum of Tons NH
|
ESMI of NY
|
Sum of Tons NY
|
|
1st Sample
|
200 Tons |
200 |
150 Tons |
150 |
|
2nd Sample
|
200 Tons |
400 |
150 Tons |
300 |
|
3rd Sample
|
200 Tons |
600 |
450 Tons |
750 |
|
4th Sample
|
200 Tons |
800 |
750 Tons |
1500 |
|
5th Sample +
|
Each Sample is equal to 200 tons, up to 4000 tons (20
samples) then 500 tons after that. |
1000 and up |
Each additional sample is worth 750 tons |
2250 |
Back to Top
Scheduling soil to the facility:
Once the waste has been properly profiled and laboratory
data has been reviewed and approved by the Precision Petroleum Labs
compliance department, the job can be scheduled through the sales
department. We encourage customers to communicate their needs as far
out as possible and keep us informed of any changes. We want your
project to run as smoothly as you do, the more involved we get in
the work schedule the better we can serve your needs.
Back to Top
Shipping:
| Required Shipping Papers |
| State |
Shipping Papers |
| New Hampshire |
Straight BOL or Non-hazardous waste manifest |
| Massachusetts |
Mass BOL, MSR or Non-hazardous waste manifest |
| New York |
Straight BOL or Non-hazardous waste manifest |
| Vermont |
Straight BOL or Non-hazardous waste manifest |
| Maine |
Straight BOL or Non-hazardous waste manifest |
| Connecticut |
Straight BOL or Non-hazardous waste manifest |
(Note: Some special situations may exist where
other documents are required on a case by case basis)
Back to Top